 | Assumptions: - For Preliminary Design Only
- Based on Max. Mid-span Moment Only
- Simple Span
- Composite 200 mm Deck
- 25 mm Haunch Thickness
- Precast, 28 day, f'c = 45 MPa
- Precast, Initial, f'ci = 35 MPa
- Deck, f'c = 45 MPa
- Strand, fpu = 1860 MPa
- 13 mm Ø Low Relaxation 7 Wire Strand
- Barrier = 355 kg/m, Asphalt = 180 kg/m2
- CSA CL-625 loading
- See Also Detail Sheets
|